Second build – Day 2

Pottering and adding bits to the bike.

  • Fit water pump and oil pump to fresh painted clutch cover
  • Fit Newly painted clutch cover to engine
  • Find and fit indicators with correct lenses fore and aft
  • Fit horn
  • Find, assemble and fit headlamp with Good chrome rim
  • fit headlamp shell to bike
  • Fit wiring loom (loosely) and connect
  • Fit coils
  • Fit Clocks (with powder coated bracket and trip knob)
  • Fit Rear wheel (with temporary spacers until I get sprocket etc from other bike)
  • Fit Airbox upper and lower
  • Fit battery box Reg/rectifier and fuses