Second build – Day 3

More pottering today before dismantling the rear wheel of my roadgoing LC to get the 250 sprockets and spacers for KVN.

  • Fit sidestand (so it’s easier to roll around)
  • Remove clocks and fix tacho binnacle light and refit
  • Fit old bodywork for now… – Front mudguard and tailpiece.
  • Radiator – run 5mm tap down the shroud fitting threads and fit
  • Overflow tank
  • 2-stroke tank – Check feed hose for splits
  • Connect up wires in headlamp shell and test lights horn etc. All good