Second build -Day 7 : Final

NOW we are ready for the final assembly, of all the new and bling parts.
Firstly, replacement of the drain plug sealing washers, and a refil with antifreeze rather than tap water 🙂

All of the needed parts are assembled and ready to be fitted.

The build proper started in February 2021, which is when I dragged the, (repaired), frame out from the corner of the garage and spruced it up with some 20 year old aerosol black enamel.
It’s taken just over a year, and £5537.90, to go from this…

…to this.