NOW we are ready for the final assembly, of all the new and bling parts.
Firstly, replacement of the drain plug sealing washers, and a refil with antifreeze rather than tap water 🙂
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3449-2848x3797.jpg)
All of the needed parts are assembled and ready to be fitted.
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3450-rotated.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3451.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3452.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3453.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3454.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3455.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3456-rotated.jpg)
The build proper started in February 2021, which is when I dragged the, (repaired), frame out from the corner of the garage and spruced it up with some 20 year old aerosol black enamel.
It’s taken just over a year, and £5537.90, to go from this…
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2020/08/0001.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2020/08/0008-scaled.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2021/06/IMG_2702.jpg)
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2021/06/IMG_2703.jpg)
…to this.
![](https://www.alphabeta.me.uk/blog/wp-content/uploads/2022/05/IMG_3454.jpg)